Leave & time off · Product guides · Peru
Confirm dates from an existing leave proposal
When proposed dates become settled in a practice scenario, update the existing interval through its correction action.
Open the example in this section. No account, with fictional data.
When proposed dates become settled in a practice scenario, update the existing interval through its correction action. This preserves the relationship between the proposal and its replacement.
Step by step
- Find the proposed interval in Leave & benefits and choose its correction action instead of adding a second unrelated interval.
- Check dates, units, counting basis, and pay treatment. Select confirmed status and explain the change in the required note.
- Save and verify the remaining balance. A confirmed opening balance is required, and confirmed dates cannot overlap another confirmed interval.
An example to practice
If two proposed days become agreed, the replacement consumes two entered units while the original proposal remains in the underlying history.
Before you finish
Do not assume changing status also confirms how pay should be handled. Dates, units, and pay treatment are separate decisions, and uncertain pay treatment requires review.
Product content updated November 25, 2026.